I try to run MRP for new material.But no plan order appear in MD02.In MRP, it only appear IndReq.I have no idea how to do.

Kindly pls advise.

Thanks a lot!!

Regards,

san

Accepted Solutions (1)

Accepted Solutions (1)

former_member196398
Active Contributor
0 Kudos

Sanjeev,

The problem could be mismatch in Requirement type.

What is your planning strategy assigned to the material in MRP3 view? What is the requirement type used to create PIR in MD61?

Strategy - Requirment Type for PIR

10 LSF

11 BSF

30 LSF

40 VSF

50 VSE

52 VSE

54/55/56 VSE

60/63/65 VSEV

Regards,

Prasobh

Answers (5)

Answers (5)

former_member184655
Active Contributor
0 Kudos

Dear Mr.Sanjeev,

Please use proper MRP control parameters for running MRP.

Try now & Revert to forums.

Regards

Mangal

Former Member
0 Kudos

hi

plsm check the stock .

if enough stock no planned order will not be created.

Former Member
0 Kudos

there is no stock and mrp is run for the first time. checked all parameters

can u guide me further pls

former_member184655
Active Contributor
0 Kudos

Dear Mr.Sanjeev,

One small doubt - After running MRP ,did u save the results?

Regards

Mangal

former_member196398
Active Contributor
0 Kudos

Sanjeev,

Have you checked the requirement type? Please send me a screen shot of MD04 for that material to blr_sap@yahoo.com

Regards,

Prasobh

Former Member
0 Kudos

Please check your MD02 parameters i.e:

Processing Key = NETCH

CREATE PUR. REQ. = 3

Planning Mode = 3

Scheduling = 1

And which planning strategy u r using? plz revert.

Former Member
0 Kudos

strategy10

Former Member
0 Kudos

Hi sanjeev,

Please check , the Bom valid from date and PIR date. it should not be after requirement Date.

regards\

pradeep

former_member196398
Active Contributor
0 Kudos

Pradeep,

Even if BOM does not exists system should create a planned order, with an expection message.

Regards,

Prasobh

Former Member
0 Kudos

sanjeev

Did u check the planning file entry as i said earlier in MD21?

prasad

Former Member
0 Kudos

In customizing check the planned order profile (transaction OPU5)...For your plant put the (*) indicator in order type and for prod controller fields.

former_member184655
Active Contributor
0 Kudos

Dear Mr.Sanjeev,

1.Please check what's the available stock and what's the requirement.

2.If stock is more than the requirement,then you will be able to see only

Ind.Requirement in MD04,as the existing quantity was consumed agianst the

Ind.Requirement.

3.Before running MRP please check the stock.

4.After giving Ind.Requirement and before running MRP ,in MD04 this will get

reflected as Ind.Requirement.

5.After running MRP please dont forget to save the MRP lists.

Check & revert to forums if any more query.

Regards

Mangal

Former Member
0 Kudos

Hi sanjeev

Check planning type in MRP1, it should be PD. Check Planning file entery MD21 there should be X in NChgePln & NChgePHor columns.

Regards

Prasad

Reward if useful.

Former Member
0 Kudos

Hi Sanjeev,

Planned order will appear in MD04.

Check material master... MRP type - PD,M0

lot size indicator - EX

Availability check - 02

Procurement type - X or E

Stratergy grp - 10,40

maintain BOM and Routing

give ind req in MD61

then reran MRP in MD02

Thanks

Bala

If solved reward and close

Former Member
0 Kudos

i did everything u sai and still cant get the solution

Former Member
0 Kudos

hi sanjeev,

what is hte planning strategy that you were using.

if you are using strategy 11 then ensure that you <b>mixed MRP</b> in MRP3 view of material master is set to <b>02</b>.

regards,

prasad