in production order cast analysis cast of materials is not flowing

Former Member
0 Kudos

hi

please help me

why in production order cast analysis cast of materials is not flowing

advance thanks

ramana

Accepted Solutions (0)

Answers (3)

Answers (3)

Former Member
0 Kudos

Hi,

Please follow the below steps:

1) MM02 - in Accounting Tab 1, check Moving Price, Costing Tab1 check whether the "Do Not Cost" check box selected and in MRP 2 Tab procurement type should be "X" of "F"

2) KZS2 - For your costing sheet, primary cost element belongs to RM has been assigned in BASE for for RM cost?

3) OKTZ - please check whether the same primary cost element belongs to RM has been assigned in assignment cost component - cost element interval, and activate the cost component structure.

former_member309133
Active Contributor
0 Kudos

This may be because the price of material is Zero. Check in material master. To maintain price run standard cost estimate or maintain it through MR21.

narasimhulu_konnipati
Active Contributor
0 Kudos

T Code - OKEU

Just check whether the Primary cost element group with "Material Consumed for Production" have been assigned or not.

Also check in Material master  (MM03) for those materials - Costing View 1 -: check boxes "With QTY structure" and "Material origin" got chekced.

If not, check these 2 options and simulate a scenario

You will get to know the results

Thanks

Former Member
0 Kudos

Also check whether the price maintained in the M master for those materials.