on 2015 Nov 30 5:50 PM
Hi,
How can we setup SAP for a inhouse repair where the material number changes after repair?
The customer would return Material A -> During the repair process Material A has been modified to Material B --> and material B is shipped back to the customer.
Note: The serial number can also be changed.
Request clarification before answering.
Hello Binu,
Regards
KJogeswaraRao
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Jogeswara,
Thanks for replying.
This is not a production process and this not a raw material. This is equipment back from the customer and a service is being provided to upgrade or retrofit the equipment to a later model with a reduced cost.
A typical aftermarket service being provided.
Regards,
Binu
Hi Binu;
As per description it seems the Refurbishment process where in part material will have different valuation types.
Say material coming for repair have X value originally but as it is damaged so value became B. After repair it will become C.
So this all is covered in refurbishment process with split valuation. Refer that process and let me know if you any more question.
Avinash
Hi Binu ,
I am assuming your process is something like this .
We get the Orders from customer and due to some component changes (decided after tear down) we send them back a different Part No (Different Part No) ,Though Ultimately it is the same part which can fit into that configuration .
To achieve this process ( which we may name modification) we need few basic designs in place.
Example:
Mat in Recieved : ENGINE MODEL 1
Mat out being sent : ENGINE MODEL 2
a) We should have a way to identify what part came in for Repair and which one goes out, Service order configuration(characteristics MAT in and Mat out ) seems to be ideal fields to store this information as this can be done through Master Data maintenance and no development will be needed.
b) Material to Material posting is required as we are consuming the Material in and making Material Out from same parts after tear down is complete. So we need to transform mat in to mat out and that appears the only way to consume what came and produce what goes. After this step ENGINE MODEL 1 becomes ENGINE MODEL 2.
c) Now our outbound delivery back to customer should contain Mat out and this is possible if that Material itself undergoes transformation or we do some kind of enhancement to populate Mat out in Outbound delivery
If you do not expect it be a regular business and it is a once in a while scenario you can change the part on equipment after the Repair process is complete send it back to customer. Not sure if it will cause any issue.
To achieve these three things we need to have a design and development in Place if you are expecting this to be a regular business.Try these three steps and see if it works in your system .
Anjan