on 2011 Jan 24 12:19 PM
Guys,
I checked the forum for any blog or thread on "How to use T-code IW42" but retrieved irrelevant search and no much information on what I am really lookingfor..
Cann anyone explain me in steps how to use t-code IW42 for PM maint order confirmation.
Good movement, confirmation of hours, services and technical completion in steps.
Currently we are using T-code IW41 for manhour confirmation.
Please explain how to use T-code IW42 in detailed steps..
Murad
Hi,
IW41 will be used to confirm operation by operation. If you want to confirm all the operations of one order, that can be done in IW42. It will save the time.
Also goods movement can be done for all the operations if you have set backflush in order.
Then we can do even TECO in IW42 before saving the confirmation (condition underlying is that settlement rule should be defined in advance for the order).
Regards,
Maheswaran.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
This should help:
Link: [http://help.sap.com/saphelp_erp60_sp/helpdata/en/e5/17ce3499139c3ee10000009b38f83b/frameset.htm]
Paul
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
HI Murad,
As its says overall confirmation for Order , Here you can confirm Operation likes IW41 at a time, with that Goods Movement if any material , reservation etc mentioned in Order so Good posting will happen here,
In this You can confirm notification task as well. Try to create one order in your DEV system with Notification and Material requirement. and try to confirm through this T code.
Riyaj
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
102 | |
8 | |
6 | |
6 | |
5 | |
5 | |
5 | |
4 | |
4 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.