cancel
Showing results for 
Search instead for 
Did you mean: 

How to proceed when "Manual reworks" in some SSCUIs are required?

Kelly_Hannel
Product and Topic Expert
Product and Topic Expert
0 Kudos

In a Productive System, under Manage your Solution ->  Configure your solution -> the information is highlighted: Manual Rework steps have been added. Complete the steps in Manual rework item below.

Accepted Solutions (1)

Accepted Solutions (1)

Kelly_Hannel
Product and Topic Expert
Product and Topic Expert
0 Kudos

Hello all,

The Manual Reworks are required because some configuration settings cannot be transported from the Quality system and you have to manually maintain them again in the Production system after the configuration transport has been imported.

This kind of activity is called Manual Rework activity. You have to check and execute these activites in the Production system. This must be done whenever configuration settings have been transported, for example, after initial implementation scope and scope enhancements (new country, new scope items).

The documentation about Manual Rework Activities in the Production System recommends some steps to access and process manual rework activities. To configure each SSCUI with Status Action Required, the status needs to be set as Open.

Here you will find the documentation: https://help.sap.com/viewer/c45442a279434254b41a9bafa0af06d4/latest/en-US/799575c0b6894a15a4f8874327...

Kindly go through the Manual Rework Activities in the Production System and complete those required steps.

After you have successfully maintained the configuration, go back to the list of configuration steps and set the status to Confirmed.

The following KBA explains the process:

‎##2817677 - Manual Rework Activities in the Production System

Cheers,

Kelly

Answers (0)