cancel
Showing results for 
Search instead for 
Did you mean: 

How to Modify a Landed Cost Document

Former Member
0 Kudos

is it possible to modify the landed cost document after journal entry is posted.

We would like to add a new landed cost component to the document after the journal entry was posted.

Is there a way to add a new component / cost to the document after the journal entry is posted.

Accepted Solutions (1)

Accepted Solutions (1)

former_member184566
Active Contributor
0 Kudos

As far as i know, you can't. Once the journal for the relevant landed costs is posted SBO automaticaly closes the landed costs document. Interviening with this is interviening SAP logic. Higly not advised.

Answers (0)