Hi

Does anyone know how I can insert a document in a production order on the "Document Links"?

I have a assembly drawing that I would like to be printed on release.

Accepted Solutions (0)

Answers (4)

Answers (4)

Former Member
0 Kudos

have you implimented Document mgt system?

Former Member
0 Kudos

thanks

Former Member
0 Kudos

Dear first u have to make a document using tcode cvo1n ,

then assign this doc in BOM

regards

Former Member
0 Kudos

Hi,

As rightly said you can have the documents or document links in material master or in BOM. But if you prefer to have the documents attached to Document links in production order, you can assign those documents to the operation of production order and remember to maintain the document link activated for production order (PORDER) for the document type.

Thanks.

Former Member
0 Kudos

Hi

In the production order its not possible. But you can assign in BOM as a document which can be seen in the order.