Group Costing Cross-Controlling area

fabioc
Explorer
0 Kudos

Dear experts,

We are developing a group costing project, in which we managed, in ck11n, the detail of the costs of the material procured from others plants (Z002 of the same controlling area).

When we want obtain the same result for the materials procured from another plant (ZXFA) of another controlling area, with the same methodology isn’t possible. In ck11n we know that the material is procured in another plant, but the costs resulting by plant Z001.

Could you help me to find a solution?

Thanks

Regards

Fabio.

Accepted Solutions (1)

Accepted Solutions (1)

kamalkumar_biswas2
Active Contributor
0 Kudos

Hi

If your controlling area is diff then it will not work..

Must be same controlling area

kamal

Answers (0)