cancel
Showing results for 
Search instead for 
Did you mean: 

Goods issue through PI sheet

raju_123
Participant
0 Kudos
261

Hi Gurus,

i am trying to simulate "Goods issue" scenario in pi sheets. for that i have assigned "CONS_D" Process instruction category to the required phase. when i release the order control recipe is not created and checked in the log- log shows- no values assigned to char. 0080 PPPI_RESERVATION_ITEM in process instruction 0010 phase 0020. then, in process instruction screen of the order, against this characteristic i have assigned "0040" which is item number of the raw material in materials section of the order. then co53, co60, co54 is done. in co54 i am getting errror message -Destination PI04 COCI_CONFIRM_MATERIAL_CONS cannot process the message .

Could you please advise what went wrong here. my expectation is that it should issue that raw material in the order and goods movement document should be posted with 261 movement.

please help me how to solve this and advise incase i need to follow different way? also advise incase if i need to issue more than 1 raw material into the order, what i should do?

thank you in advance.

Accepted Solutions (1)

Accepted Solutions (1)

former_member928196
Active Participant
0 Kudos

Hi Raju,

Check the below  -

In the CRD setting - O10c have you mentioned in the Gen Scope as 01 (For all reservations).

Also assign appropriate filter (Variant for Program RCOCPRVG) in the Filter for the PIC.

Check the Message category assigned, if the message category has the relevant destination FM assigned.

Check if you have assigned the components to the appropriate phase with the right Control key assigned to the phase.

Regards

Amol Kale

raju_123
Participant
0 Kudos

Hi amol, thanks for the help. could you advise what filter should be used for gi so that i issue only components not the header material? please advise. please note general scope is defined as 01.

former_member928196
Active Participant
0 Kudos

Hi Raju,

Please create a suitable variant for the Program -RCOCPRVG, example below. You can also maintain the materials in the variant. Assign this cariant under Filter coloumn in O10C.

Regards,

Amol Kale

Answers (0)