on 2011 Aug 29 9:34 AM
What is mean by set up formula and processing formula in work centre? How and where they get used?
Set up formula is the formula used to calculate the time to set up a w/c before the actual production starts.
Processsing time is the time required to produce the material (which mainly depends on the qty produced).
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi, Pchetan
you should go through tcodes op7b(to create new parameter) and op21( to create new formula)
Formulas are used for the following pupose
Calculation of execution time
Calculation of capacity requirements
Calculation of costs of a work center's activity type.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Search the forum.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
114 | |
8 | |
6 | |
6 | |
6 | |
6 | |
5 | |
5 | |
4 | |
4 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.