on 2012 May 07 3:59 PM
Hi All,
I have two questions regarding fleet management in SAP EAM:
1st.
How can I fill in report MCIZ the three columns named "Costs per route", "Costs per hour" and "Total act. costs". By the analysis I already make, I think Total act. costs come from S061 structure. In this structure the field IAKOSIST is populated with a value, but in table S114 this field is not filled up. How can I have the columns filled?
Note: I am not using transaction code IFCU to make movement type 261 to standing order. To do this I am using transaction code MIGO or MB11
Example:
Table S061
Table S114
2nd.
Under the "Consumption Data" in equipment master data, we have two fields from maintenance dates: NextServiceDue and Order Number. I already have the first field populated with data from MHIO table, field GSTRP. My question is how to populate the field Order number. I cannot have both fields populated? From IP10 transaction code, if I create the maintenance order from planned date (MHIO-GSTRP) the table MHIO is updated and GSTRP field is populated with 00.00.0000 and then in equipment master data the information disappear.
Example:
IP10 transaction code. There are only planned date without order
Equipment master data
If I release the call to create maintenance order
Equipment master data
Kind regards,
Rogério Reis
hi
For filling in MCIZ you need to enter the readings and consumption through MCIZ , then you can populate the same
total cost will be updated based on order created for equipment and material posted through IFCU
also refer the following thread http://scn.sap.com/thread/3162803
For the order number to be poupulated , kindly release the order , it will show the order no , if further dates is not available for the maintenance plan then the date field will be blank
Regards
Thyagarajan
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
I have created a new maintenance plan but still no order is filled on consumption data in equipment.
In my situation the date that is filled under NextServiceDue is from the next scheduled hold in maintenance plan and this maintenance call has not yet an order created.
How can I get the order from actual scheduled called and not from next scheduled hold?
Regards,
Rogério
User | Count |
---|---|
105 | |
8 | |
6 | |
6 | |
5 | |
5 | |
4 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.