cancel
Showing results for 
Search instead for 
Did you mean: 

Factory calendar missing or error in factory calendar

Former Member
0 Kudos
10,401

Hi Experts,

i am getting the following issue in FI-MM Integration in the T-code MB1A (Consumption).

Factory calendar missing or error in factory calendar

Message no. AG014

Diagnosis

A configuration error has occurred.

Procedure

Check the various horizons of the factory calendar in Customizing. If you do not have the appropriate authorization, contact system administration.

I have maitained factory calender in SCAL t-code then what i have to do with this,i got this issue in Raw Material Consumtion.i have maitained cost center field.

where i have to assign this calender ??

Thanks

sada

Accepted Solutions (1)

Accepted Solutions (1)

JL23
Active Contributor
0 Kudos

the factory calendar is to be assigned to a plant in In IMG -->Enterprise structure --->Definition -->Logistic general --> Define,copy,delete,check plant.

Former Member
0 Kudos

mr.Jürgen L

you are talking about define ,copy,delet plant

but my question is how to assign factory calender to plant

as you said how do we maintain through the path you specified?

thanks

sada

JL23
Active Contributor
0 Kudos

what is the difficulty in this transaction to assign a calendar to a plant?

you chose define plant  step

select you plant and go into its detail

and you add/exchange the factory calendar there

Isn't there already a plant assigned? how else could you add inventory? As you are trying MB1A I have to assume that you have already inventory.

How could you know which calendar you had to change in SCAL if you dont know what calendar is assigned to the plant?

Former Member
0 Kudos

Thanks

got it

Answers (0)