cancel
Showing results for 
Search instead for 
Did you mean: 

Extension of material from Plant A to B

former_member824495
Active Contributor
0 Kudos

Hi,

I have 8000 qty of material(consumable, capital, spares etc) in Plant A. I want to extend these 5000 material to plant B. Some fields has to be changed like plant, profit center(If applicable), st loc, accounting etc.

Which will be the best way to do this. We r using internal no. range for these materials.

Please guide me.

Thanks & Regards,

Piyush

Edited by: Piyush Mishra on Dec 25, 2007 6:42 AM

Accepted Solutions (0)

Answers (5)

Answers (5)

Former Member
0 Kudos

Hi piyush,

go to SE38,

run the program RMDATIND program,

reward if helpful

rgds

lakshmi reddy

former_member824495
Active Contributor
0 Kudos

Hi Lakshmi,

Thanks for ur reply. But I don't know what to do in that program. Can u plz explain in detail what I need to do?

Thanks in advance.

Piyush

Former Member
0 Kudos

hi,

I hope that u will goto BDC prog

regards

ka

Former Member
0 Kudos

Hi Piyush,

I think you should go for LSMW procedure to extend materials to other plant. It will not take much time. At the same time it will be useful in case you need to extend the materials to another plant in future.

Nikhil.

former_member824495
Active Contributor
0 Kudos

Thanks Nikhil.

I too was thinking to do it with LSMW.

Regards,

Piyush

Former Member
0 Kudos

Either develop a BDC program to extend the material

OR

Develop a LSMW by batch recording method to extend the materials

Former Member
0 Kudos

hi Piyush,

you can use MM17 or write a batch input with LSMW

(MM17 is easyer but if you do it online you can only prosess 500 materials at a time)

good luck

shachar