on 2016 Jun 02 3:16 PM
Hello,
For a material the shelf life is set as 24 and indicator is M(month)
the user expects that the expiry date for this material should be set accordingly,
the date of Manufacturing of material is 04.11.2015 and expiration date should be 04.11..2017
But in table MCH1 the expiration date (VFDAT) is 04.11..2075 which is incorrect.
Now we are trying to replicate the issue in our Dev systems and when we make changes to the field Total Shelf life of material we are expecting the expiration date to be changed accordingly but the date does not change.
How does the expiration date for material gets updated in the table MCH1? is there any job that we need to check?
Hi,
As of my knowledge, change in SLED in material material master wont update automatically in the existing batch master data. You may update the same manually in MSC2N.
Regards,
AKPT
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
93 | |
8 | |
7 | |
6 | |
5 | |
5 | |
5 | |
4 | |
4 | |
4 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.