Dear Phbabu Babu,

first of all, I copy relevant SAP Help links to you:

'EH&S-QM Interface' https://help.sap.com/viewer/c4e98fcb44e74814b58b61aefc1b1fcb/latest/en-US/c517bf53d25ab64ce10000000a...

'Integration of Inspection Plans' https://help.sap.com/viewer/250374f0514e4e0f9057066374265eba/latest/en-US/ca5dbd534f22b44ce10000000a...

***

Additionally, the documentation of transaction QPCG (program RQMIP_SPECIP_MATCHING)

"RE RQMIP_SPECIP_MATCHING

Use

This program allows manual or semiautomatic synchronization between EH&S specifications and inspection plans.

Integration

You can navigate to the specification or inspection plan by double-clicking the initial icon of a node in the tree.

Requirements

You have already created inspection plans for the respective specifications in the transaction QP21S.

Selection

Taking the selection criteria into account, all specification/inspection plan combinations were selected for which changes were made to the specification that have not yet been checked.

In background processing, the user stored in the selection field P_AGENT is notified by e-mail if synchronization is required.

Output

The program outputs all specification changes that were made after the last time changes to the inspection plans were confirmed.

Activities

    1. Check all changes to the specification for their relevance to the inspection plan.
      2. Make the corresponding changes in the inspection plan. For properties and material assignments, you can also start a semiautomatic synchronization if a checkbox is available for selection.
        Note that with the semiautomatic synchronization in the inspection plan, material/plan assignments or dependent characteristic specifications can only be created or changed, but never deleted.
          3. When you are finished, confirm that you have taken the specification changes into account.
            The system then sets the current time as the time stamp and takes changes to the specification into account that were made after this point in time."

            ***

            I recommend you to check already available questions and answers in the Community, if you face a specific problem while implementing any solution. Some links I collected for this topic:

            https://answers.sap.com/questions/3243223/ehs-qm-interface-inspection-plan-creation.html

            https://answers.sap.com/questions/12100530/sap-ehs-qm-interface.html

            https://answers.sap.com/questions/12090541/ehs-qm-interface-functionality.html

            https://answers.sap.com/questions/11748528/how-to-trigger-ehs-qm-to-do-inspection.html

            https://answers.sap.com/questions/10132536/ehs-qm-interface-test-requirements-defined-on-ingr.html

            https://answers.sap.com/questions/12090466/index.html

            https://answers.sap.com/questions/12100530/index.html

            https://answers.sap.com/questions/11747780/index.html

            Have a nice day,

            Albert

            ***