on 2008 May 28 10:54 AM
Hi, All
I have linked some documents in [CO02] production order to operations through PRT.
as my knowledg it has to be trigger in routing[CA03] when i click PRT header data.
But this is not happening. I m working in development server.
I tried both way from Routing to Production Order Also. But document link is not establising in both cases.
Also [CS02], bom item/header, linked documents are not triggering in production order[CO02]
Rgds
Ben
ans,
PRT