in dynamic modification, in "validity of quality level" tab there Reset period (days).
what is that?
As you know you`ll be defining inspection stages in DMR, if you want to reset or revert the quality level to initial stage, than you need to mention the reset period after this action to be executed.When an inspection lot is created, the system checks if the reset date for the quality level has been reached or exceeded at each sample calculation. In such a case, it resets the qualiy level to the initial stage of the dynamic modification rule and uses this initial stage for the current inspection lot.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
what i understood is -
suppose i created the DMR on 01.01.07. and my reset period is 15 days.
then if i am creating a lot on 15 or after 15.01.07, whatever may be the present quality level, it will reset to initial level and from here again new cycle will start.
is it so?
if so,
thanks a lot.
if not,please clearify.