Display of Standard cost and production order plan values are different

Former Member
0 Kudos

Dear all,

When i run the standard costing system showing Rs.100 as standard cost but in the production order plan column system showing Rs.102 as Plan cost.

this difference is appearing when i use cost trend layout but in Plan and actual comparison it is showing correctly.

Can any one tell me which is causing for the difference.

Please suggest.

Accepted Solutions (0)

Answers (3)

Answers (3)

Former Member
0 Kudos

Hi,

Can you brief the issue where exactly you strucked?

Regards,

Srinivas salpala

Former Member
0 Kudos

yes

It is showing Rs 102 in the plan column of the Production order (CO03)

this 102 includes Materials and Overheads

but in out of 10 material in the BOM one material price is showing differently

eg.in CK13n it is Rs.10 and in CO03 the price for the same material Rs.12.

Thanks

kishore

Former Member
0 Kudos

any suggestions please

Former Member
0 Kudos

Hi,

Kidly check your standard costing plan/actual valuation strategy (OKKN) and production order plan/actual valution strategy (OPL1),Aslo check the subcontracting strategy in both cases.

hope this helps you and let me know if any queries.

Regards,

Puri.

Former Member
0 Kudos

Hi Kishore,

Can you check the material price, which is showing INR12. In BOM, we will maintain only materials, and the price will pick only from the material master.

It may be INR12 in that material material master.

Pls check and revert back.

Regards

Srinivas Salpala

Former Member
0 Kudos

How can subcontracting will influence in this scenario.

Former Member
0 Kudos

Hi,

Your total COGM cost means : material cost+Subcon cost+activity cost+ overhead cost

that is why i am telling, you can check your subcontracting strategy also in both the cases.

Regards,

Puri.

Former Member
0 Kudos

Hi Kishore,

   Let me know

  1. how many BOMs available for the Finished material

   2. Which method you used for std cost estimate (CK11N or CK40N)

   3. Is RM having both prices (Moving Avg and Std cost) in the Material Master?

Thanks,

Lakshmi Narayana.M

Former Member
0 Kudos

Dear Kishore,

The possible reasons for the mismatch is:

1. may be your costing lot size and order quantity different.

2. Your valuation variant pricing strategy different with the valuation variant  in plan costing variant in T code OPL1.

please check accordingly.

Regards,

Ravi.

Former Member
0 Kudos

Hi

I have same valuation variant for Standard , Plan and Actual.

No change in that.

Former Member
0 Kudos

You mean in plan cost column your FG cost is coming with 102 Rs?

Generally the plan cost for FG is: plan quantity*standard price.

Regards,

Ravi.

Former Member
0 Kudos

Hi,

Kindly check the material valuation strategey for standard costing variant and production order costing variant.

hope this helps you and let me know if any queries.

Regards,

Puri.