on 2016 Jan 27 11:06 AM
Hi Gurus,
in my scenario is used MIRO to post additional costs related to a material after material transference (tributes ICMS-ST) . The post has the same effect by MR22. So, the MIRO is posted to the material and after to the closing period its generate a price difference for the material and we can see this value in CKM3N at "Other input/Consume" and in CCS this value is distributed into some cost components .
The requirement is to assign these costs in a specific cost component (Tributes).
So, it's possible to determine the cost for an specific cost component?
Can anyone help me?
Tks!!
Gleisson
Request clarification before answering.
Hi Gleisson,
Please explore Business Add-In GET_DEFCCS. Read the documentation in T-Code SE18.
This badi can help to change the actual cost component split.
Additional information can be found in note 511443 & 996304.
Regards
Satya
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Satya,
Thanks for your reply.
I've been explored this Badi. In fact, I'm want to understand how the ML distribute these value (price differences) into cost componentes, and from that, try to change or determine the values for a cost componente pre-determined. If I haven't no choice I'll implement the BadI.
I know that is not by OKTZ, but how?
Again, thank you a lot for your fast reply.
Hi Gleisson,
Parameter IS_KEPH contains the default cost component split, if it determined by the System. See the documentation for method BADI_ACTIVITY.
Parameter ES_KEPH is returned by the method and contains the modified cost component split.
Regards
Satya.
User | Count |
---|---|
102 | |
39 | |
6 | |
5 | |
4 | |
3 | |
3 | |
2 | |
2 | |
2 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.