Hi,

After running MRP through MD02 of a FERT Material, dependent requirements are generated of ROH and HALB. But no planned orders are generated. Can anyone explain why is it happening?

Regards

HHS

Accepted Solutions (0)

Answers (7)

Answers (7)

Former Member
0 Kudos

Hi All,

I have got the solution. In fact Availability check was not ON on the ROH material. Now its working fine

Thanks to all,

Best Regards

HHS

Former Member
0 Kudos

Hi,

I have Zero stock of ROH so purchase requisition should be created. What is the reason that its not created?

Regards

Former Member
0 Kudos

hi

Check MRP TYpe = PD

Stock is less than ur requirement.

In MRP 4 Mrp dep requirements Field is blank.

ur dep requiremnt Storage location should not be excluded from MRP run . CHeck in MRP4 View.

Amit

Former Member
0 Kudos

Hi,

Please check with below points for ROH,

MRp View

MRP type = PD not equal to ND

Plant specific mat staus =blank

Stock = Zero

Exception message ifany at Header material Planned order.

Pradeep

kaushik_choudhury2
Active Contributor
0 Kudos

Hi HHS,

As per my understanding if there is already sufficient stock for the ROH & HALB material then the dependent requirement will be full filled from the plant stock.

Check the same & confirm.

reward points if you find this info helpful

Regrads

Kaushik

Former Member
0 Kudos

Hi,

Check in material master of HALB, haveyou assigned any spl.procurement key?

Regards,

Dharma

Former Member
0 Kudos

Hi,

if there is no sufficient stock , then the possible reason for the planned orders not generated may be , the BOM is not exploded.

pls check the possible causes for the BOM not getting exploded.

Regards,

Sheik