Default costing sheet

Former Member
0 Kudos

Dear All,

In COR1,while creating Process order, i want to make my cost sheet ex CSDF1 as default in the control tab for costing. How can i do this???

Regards

Vasantha

Accepted Solutions (0)

Answers (1)

Answers (1)

Former Member
0 Kudos

Hi,

The Costing sheet that appears in your Process order is driven by the Costing Variant maintained in the Order type Parameters in the Config.

T Code: COR4 :

Menupath : IMG> Production Planning for Process Industries > Process Order> Master Data> Order > Define order type Parameters.

In this you have a Tab called Controlling wherein you will maintain the costing variant. If the costing variant which you use has the costing sheet which you desired to have in the Order, you can maintain the same in this place.

Hope this should help you.

Regards

Nambi