on 2012 Jan 23 4:46 AM
Hi
Please help this issue....
valuation type 01 - Alternative BOM No 2---6982,34
valutaion type 03- Alternative BOM No 1---20915.06
I need to run CK11N for both the Valuations...
The above amount has to post into Accounting1 -Valuation type 01 ---6982,34
Accounting1 -Valuation type 03 ---20915.06
Currenlty it is not updating... Please suggest.
What configuration.. I have not done.
Hi,
Please refer to NOTE 552486 (FAQ):
"Question 10: In the case of a split valuation, why can the prices only be updated in the internal segment?
Answer:In the initial standard SAP System, only the header segment is calculated and the price is updated only here.However, if the "Valuation type 'in-house production' mandatory" flag is set for the categories in Customizing (Transaction OMWC), it is also possible to update the price in an internal segment.For external segments (procured externally) this does not make any sense in general.However, mixed costings can also be created and updated for several segments via procurement alternatives."
If one material has split valuation, standard price will be released only for header segment (valution type blank). You have the possibility to release standard price for in-house production segment, if you set the 'Default'-flag in the customizing transaction for splitted val. (OMWC) for the val. category 'X'.
Also the only way to mark and release a standard costing per valuation type is by using the functionality of mixed costing, where you can create different procurement alternatives for the different valuation types. That means that you have to define a quantity structure category e.g. your category F, and define a procurement alternative based on a valuation type of your material e.g. types F, F00, F98. Afterwards you have to define a mixing ratio for your material and the defined quantity structure category. If you mark and release the mixed cost estimate the system will set the standard price on valuation type level (prerequisite: you have defined the procurement alternative based on the valuation level).
regards
Waman
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Warman,
need help.
I need to do for materail mixed costing .
065N0950 - alternative BOM 3 - val type 03---Price 500
065N0950 - alternative BOM 1 - val type 01 -
price 600
for the above materail ... what all the pre requition. shall i need to check in my system ..
please suggest.
CK91N
CK94
CK11N
CK94
This is the T.CODE i am following. if it is not correct. Please advice.
you are answer will save a lot.
Hi Priya,
I believe you can post either of one in Accouting 1 view.
In CK11n you can choose the alternative BOM for which you want to run the cost estimate irrespective of the valuation type.
This cost estimate gets saved in MM when released.
Regards,
Divraj
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
hi
check your material master for the valution type maintained or not.
also check your OBYC settings
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
113 | |
8 | |
6 | |
6 | |
6 | |
6 | |
5 | |
5 | |
4 | |
4 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.