Hi costing Gurus,
I am having a multilevel BOM for eg. A (FERT) -> B (HALB) -> C (HALB) -> D (HALB) -> E (HALB) -> F (ROH).
All Halb have the procurement type "X" and in a month I can purchase F and produce my FG or purchase E and produce my FG or purchase D and produce my FG.
The issue is,
When I do costing run, then system always takes the price of mat. F and different stage conversion cost posting the same to FG even if we did't purchase mat.F in that month.
My requirement is,
1. In a multi level BOM, if I purchase any halb then costing should automatically start from this purchase mat and run till FG.
2. If I purchase two materials eg D and E in a month then system should do costing run from mat. E but for D it should take purchase price and update in mat. master and run till FG.
3. In one particular month, I am purchasing mat. F and producing E,D,C and B but not A (fert) then costing should start from F and run till B and for A only previous mat. master price should be updated for current price after costing run.
I am noting costing Guy pls guide me.
Regards
Guna
not got the solution
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Dear All,
Why don't you try separate material master code? It is logical that way...
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
I think we need some more detail to question.
In your SAP, in your Material masters what is the Price Contol indicator set at? Standard or Moving average?
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
110 | |
9 | |
8 | |
6 | |
5 | |
5 | |
5 | |
5 | |
4 | |
4 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.