Cost Estimate using Commercial Price 3 of BOM item

Former Member
0 Kudos

Dear Experts,

I am trying to create a cost estimate for certain materials using ABC costing variant. The objective is that the cost estimate should pick up Commercial price 3 from the material masters of the BOM item and then calculate cost estimate for the main product (The costing variant has been customized this way). However, for certain main products, the system is picking up the standard price of the BOM item and in some main products it it correctly picking up the Commercial price.

The BOM items used in the different products are different.

I am unable to understand this behaviour. If anyone has come across any such problem before, please help.

Regards,

Aditya

Accepted Solutions (0)

Answers (2)

Answers (2)

former_member188826
Active Contributor
0 Kudos

You may want to consider populating the Planned price 1,2 &3 maintained in the Costing view. The system can take this price as a basis for product costing. You can maintain the validity dates as well.

Former Member
0 Kudos

hi,

Check the Valuation variant and the strategy sequence whether you have selected the Commercial price 3 as the first priority and the Standard price as the next priority. If u don’t want the standard price to be picked u remove this in the strategy sequence.

Further where the system is picking the standard price, possibly the commercial price 3 has not been defined in the material master. Possibly , the system is unable to find the commercial Price 3 and it is fetching the next Price as defined in the valuation variant which is the standard Price.

assign points if useful.

regards,

Former Member
0 Kudos

Hi Rajaraman,

The commercial price 3 has been maintained in the material master of the BOM item. The strategy in the valuation variant is to pick up the Comm Price 3 first, then the Comm Price 1 and then the standard price.

Thanks,

Aditya