Cost centre

Former Member
0 Kudos

Hi

Any one le me know how to Unlock the cost centre.

Thanks

Prasad

Accepted Solutions (1)

Accepted Solutions (1)

former_member309133
Active Contributor
0 Kudos

You can unlock the period so that posting can be made.

To maintain the period lock for the corresponding Controlling component, go to the menu in Cost Element Accounting, Cost Center Accounting, Cost Object Accounting, internal orders, or Activity-Based Costing and choose Environment -> Period lock -> Change

iklovski
Active Contributor
0 Kudos

Well, this is called unlock of a period in controlling, not of a cost centre.

Answers (4)

Answers (4)

Former Member
0 Kudos

hi,

For this T.Code is KS02, Give the details of cost centre to which u want to unlock, After entering in it go to 'Control' tab and uncheck the relevant lock indicators.

Former Member
0 Kudos

Hai

Go to ks02 change cost center and select control tab in that area you can lock the cost centers for a particular purpose

NSRao

durgasankar_innamuri
Active Contributor
0 Kudos

Hello prasad,

go to KS02 there in control tab all the check boxes are ticked. just untick for unlock.

if the above is not correct check for validations.

in case problem revert me back

regards,

Sankar

iklovski
Active Contributor
0 Kudos

Hi,

Go to KS02, enter the cost centre, go to 'Control' tab and untick the relevant lock indicators.

Regards,

Eli