Controlling Level At The Production Order Level

Former Member
0 Kudos

Hi,

I want to set the ML controlling level to the production order level because I want to see the actual BOM used for each production order at the production order level. Since a different BOM may have been used for each production order (although the FG is the same) i must be able to see the actual BOM for each production order at the CKM3N screen.

However in the controlling level setting there is no way to set the controlling level up to the production order level. May i know why?

Accepted Solutions (1)

Accepted Solutions (1)

udo_werner
Product and Topic Expert
Product and Topic Expert
0 Kudos

have a look at note 1320758, describing how to achieve that.

best regards, Udo

Answers (2)

Answers (2)

venkatasatyakrishna_achan
Active Contributor
0 Kudos

hi

check this link

http://help.sap.com/saphelp_470/helpdata/en/b2/6d118acb0a11d28a150000e83234f3/content.htm

check whether production order level is possible. i dont thinks so.but it highly affects your system performance.

krishna

Former Member
0 Kudos

hi

all your reporting are related to the org. structures