PP-PI scenario:

Requirement from the user to change the process instruction category

from control recipe destination.

After adding the process instruction category in control recipe destination what else we need to do to make the process instruction category working?

Any other step need to be performed if so what they are?

Can some one tell me the step by step activity that needs to be performed.

Edited by: kkr_chandran66 on Mar 4, 2011 2:19 AM

Edited by: kkr_chandran66 on Mar 4, 2011 2:21 AM

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Assuming that you are going from any category to "0", then no specific changes are required.

But check some basic sintax rules in Category "0" regarding the order to be maintained.