Confirmations for production orders are not updating cost centers

Former Member
0 Kudos

Hi All,

When the confirmations are done for a production order in a particular workcenter (A), the costs for corresponding cost center(B) is not updated and no error message is given. The same customizing settings for a workcenter C updates its

corresponding cost center D. A and C are in the same plant same settings and

B and D are under the same controlling area with same customizing. How can it be possible. What should I check? Has anyone seen a similar situation before?

Thanks in advance.

Accepted Solutions (0)

Answers (2)

Answers (2)

former_member196398
Active Contributor
0 Kudos

Hi Emrah,

Could you please explain what do you mean by Updating cost for Cost center? Are you taking abt "Activity ID" and price?

Or

Are you using costing sheet to derive any allocation to cost center?

Regards,

Prasobh

Former Member
0 Kudos

Hello Emrah,

Please check the valuation veriant and costing sheet which has assigned to costing variant and same in order type.

Particularly you check which cost upadate you have defined in this valuation varaint (moving average proce or standard price)..according to this one you maintained the price control in costinf view of the material master.

If helps please rewards your points.

Regards

TAJUDDIN