on 2012 Dec 24 6:40 AM
Hello All,
I have some Inspection Lots with CRTD status for the By-Products. Those Inspection Lots are created by mistake which are reference to Production Orders. Now I want to cancel the Inspection Lots (I don't want to record any parameters). Stock movement from QI stock to Unrestricted Stock will be separately.
Is there any possibility to do that?? By doing so, those Inspection lots should disappear from QA32 or all other Inspection Lots screen as open Inspection Lot.
Note: I have been doing search in forum & SAP help as well.
Meanwhile, If someone can suggest way, it will be helpful.
Regards,
Maheswaran.
Hi..
cancel GR . inspection lot will be automatically cancelled.
regards,
Aditya
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi ,
You can manually attach plans to it in QA02. Even if you are not doing RR system will not stop you to do UD .
Regards
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
By reading the threads & SAP Help, I understood that its not possible to cancel the Stock Relevant Inspection Lot without cancelling the concern Material document.
I am closing the thread.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
111 | |
8 | |
8 | |
6 | |
6 | |
5 | |
4 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.