cancel
Showing results for 
Search instead for 
Did you mean: 

CMIR record does not getting updated in R/3

Former Member
0 Kudos

Can we link 1 MATERIAL To 2 CUSTOMER MATERIALS,

I tried doing that but it is not happening

Can anyone please tell why it cant be done?

Regards,

Anoop

Accepted Solutions (0)

Answers (2)

Answers (2)

former_member183879
Active Contributor
0 Kudos

Hi,

Using 2 different customer material number of the same customer for the same material is definitely not possible.This is the expected behavior in SAP for obvious reasons

However for different customers, different customer material number can point to the same material in SAP. Please check this

Lakshmipathi
Active Contributor
0 Kudos

Dear Anoop

No it is not possible. The relation between manufacturer material code and customer material code is one to one which is a standard.

thanks

G. Lakshmipathi