on 2016 Apr 06 5:00 PM
Hi Experts,
While executing Multilevel Price Determination, i am facing following error:
Message No. C+816
Material 50000014 with valuation type in valuation area 1001 was used as an input material in the period. You can perform multi-level price determination for the corresponding output material only if the input material has the status Price determined multi-level, Closing entry reversed, or Closing entry completed.
The input material, though, has status Price Determined (Single-Level).
The system does not allow the multi-level price determination.
Perform multi-level price determination for the input material.
Please guide how to fix that issue? We are using ECC 6.40.
Regards,
Zain Bashir
Thanks to All. Its Fixed
It was due to some missing Actual Rates per Activity Type which causes this issue at first place. I re-executed ML Run from scratch and it worked as required.
Regards,
Zain Bashir
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
MLHELP_FILL_GAPS_IN_PERIOD
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
What is the status for 50000025 for period 2016 03 now?
BR,
Owen
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Zain, if you carry out the steps from selection in CKMLCP, any new materials that have activity after your first run will be considered or any sequencing issues will be addressed. Please perform the rerun and confirm.
Srinath Polati
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Zain
When you do the Step "Determine Sequence", it determines a Costing Level for each item
Level 1 applies to Raw Materials, Level 2 onwards to SFG, and so on
What this means is first the L1 materials will be costed, then L2 so that Price Differnces are rolled up properly
If you did that Step correctly, this Error must not come. Check whats the Costing Level for this material and see if Single Level and Multi level for this material is complete, before you do for SFg/FG
Ajay M
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Dear Mr Ajay,
Please find attached screen shot:
Apparently, this issue will be fixed if we manage to fix Material # 50000025. Amazingly, this material was perfect while executing last to last month's ML Closing
I checked all components of that materials have been determined during Single Level Price Determination. This material should not behave like this but may be i am missing something.
Please guide?
User | Count |
---|---|
97 | |
8 | |
6 | |
6 | |
5 | |
5 | |
5 | |
5 | |
4 | |
4 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.