Hi,

I have a sceanrio, where my material, I need to make a new alternative Unit of measure, because vendor has changed its packing, earlier 12 pcs fit into box now only 10 pcs fits into box, due to which I need to add new AUOM, can I make 12 pcs = box , inactive in SAP, is there any possibility, through customisation, because my order unit and delivery /issue unit changes to 10 pcs= 1 box. Right now have 3 lines showing as,

PC<=> 1 PC

BOX1<=>12 PC (Need to make this inactive)

BOX2<=>10 PC.

BR

Bob

Accepted Solutions (0)

Answers (3)

Answers (3)

Former Member
0 Kudos

Hi,

I doubt this is possible, you can have only single conversion for an alternative UOM, ie, either 1 box = 10 Nos or 1 box = 12 Nos, this change can be done in the MMR at any time, provided there is no inventory at the time of change, If there is any inventory, then the stock of the Alternative UOM will change accordingly,

Regards

Merwyn

Former Member
0 Kudos

Hi

Need to maintain in material master and old Info record

former_member433442
Active Contributor
0 Kudos

Hi,

If you are maintaining this in the material master, then you can delete the old one and create new one.