as for a simulation purpose, we need to copy all data of a project in PRD system to QAS, and do the simulation in QAS...
all data basically means that the plan/actual revenue/cost, project stock, open/closed PR/PO...and...everything...
is this possible?? otherwise we have to create all these stuff manually...which could be really time consuming...
Thanks for any idea!
Request clarification before answering.
talk to the Basis guys - this should be possible