Hi

as for a simulation purpose, we need to copy all data of a project in PRD system to QAS, and do the simulation in QAS...

all data basically means that the plan/actual revenue/cost, project stock, open/closed PR/PO...and...everything...

is this possible?? otherwise we have to create all these stuff manually...which could be really time consuming...

Thanks for any idea!

View Entire Topic
virendra_pal
Active Contributor
0 Kudos

talk to the Basis guys - this should be possible