Dear expert

I want to know that Is it possible that MTBR is calculated based on today's live date.

Means Suppose example

1st working Hr-200 Hr

1st Breakdown Hr-10 Hr

2nd working Hr-300 Hr

2nd Breakdown Hr-20 Hr

MTBR=(200+300)/2-Currently system giving this data

Now I want that system should calculate like this

MTBR=(200+300+(Working Hr till date))/2

Is it possible?

Accepted Solutions (0)

Answers (2)

Answers (2)

peter_atkin
Active Contributor
0 Kudos
  1. Set a start-up date in the equipment/Floc
  2. Enter notifications with the breakdown flag set and the relevant time for the breakdown
  3. Run report MCI7 to get the the MTTR/MTBR results

.

PeteA

0 Kudos

Yes sir

I am doing same thing which you mentioned but problem is system capture till U6 only and we want that system should capture running A7 also.

peter_atkin
Active Contributor
0 Kudos
0 Kudos

Hi Peter

My question is different

It is can I get MTBF based on the date when I am taking the report.

Means Suppose example

1st working Hr-200 Hr

1st Breakdown Hr-10 Hr

2nd working Hr-300 Hr

2nd Breakdown Hr-20 Hr

MTBR=(200+300)/2-Currently system giving this data

Now I want that system should calculate like this

MTBR=(200+300+(Working Hr till date/time))/2

So If my last breakdown was on 13th Nov and I was taking a report on 15th Nov system should give me MTBR="X", If was take the report on 16th Nov system should give me MTBR=X+1 day,If was take the report on 17th Nov system should give me MTBR=X+2 day,

0 Kudos

As per attached Image U1 to U7 is Uptime & D1 to D6 is downtime

My system currently giving data MTBR=(U1+U2+U3+U4+U5+U6)/6 (Because U7 is real-time data is continuously moving)

My requirement is MTBR=(U1+U2+U3+U4+U5+U6+U7(TIll date/time)when user is taking report)/6