Hello all

If we change  the cost relevancy in the routing,it doesnt show in the CA60 and CA61.

It happen for some plants only.

Thanks

suresh

Accepted Solutions (0)

Answers (1)

Answers (1)

Former Member
0 Kudos

Are both the BOM and the Materials extended to those plants?

Neal

former_member222080
Participant
0 Kudos


Hello Neal

It has BOM and assigned the items to the operation,if we chnage the cost relevancy,it not shoing in CA60 and CA61

Thanks

Suresh kumar