Budget control through WBS elements ** Urgent**

Former Member
0 Kudos

Hi all,

We have company code with currency IDR and controlling area currency as INR.

While allocating the budget in CJ30, my client wants to see all the figures in IDR i.e. the budget currency as well as assigned/exhausted amount in IDR.

Now, I changed the budget currency to object currency (IDR) in Budget profile in OK02 and its working fine. But still the exhausted / assigned figures are continued to be in INR as the Availability control was set at Controlling area currency level i.e. at INR

Now, when I am trying to set the availability control at object currency level (IDR), it is giving a warning message that “Availability check can only control the budget if the transactional currency is same as object currency”. Even then I saved the setting.

Now the Budget control check is not available on Capital Import Pos where the Transaction currency is not the same as object currency i.e. not in IDR.

Pls suggest me if there is any way out for this.

Thanks a lot.

Accepted Solutions (0)

Answers (1)

Answers (1)

Former Member
0 Kudos

i guess if you check the form settings may be you can change it to Object currency, By default its transaction currency. i think the report you are talking about is a sort of report painter or drill down reports. May be you can copy this repor and change this.