Dear Experts,

We had a PO for 125000 qty of a material agaisnt which the GRN was done by stores

when quality fellow inspected the inspection lot only 25000 were found ok and the same were posted into unrestricted stock through UD

After discussion with vendor now we ara again required to bring back rest 100000 quanitiies to un restricted stocks as the same were routed through 122 movement by system automatically

please suggest

Thanks and regards

Pawan kHurana

Accepted Solutions (0)

Answers (1)

Answers (1)

Former Member
0 Kudos

We had a PO for 125000 qty of a material agaisnt which the GRN was done by stores

when quality fellow inspected the inspection lot only 25000 were found ok and the same were posted into unrestricted stock through UD

After discussion with vendor now we ara again required to bring back rest 100000 quanitiies to un restricted stocks as the same were routed through 122 movement by system automatically

please suggest

You can do 123 movement type. 123 is the reversal of return delivery to vendour. In MIGO you can do this transaction. If this is not happening you can do GR of that 100000 quantity against PR once again.

Regards,

KrishnamurthyDSS