Bom Explosion and MRP

Former Member
0 Kudos

We have a material (FER3) with procurement type E and MRP type X0. This material has a BOM with 2 components (procurement type F and special procurement 20 and MRP type PD).

When we run the MRP (MD02), itu2019s generated a Planned order for the FER3 (which shouldnu2019t happend) and nothing for the components (which should have generate solpeu2019s).

The father material shouldnu2019t be fabricated and the components should have solpeu2019s.

Thanks you!

Accepted Solutions (0)

Answers (2)

Answers (2)

Former Member
0 Kudos

What is mrp type 'X0'. If the materials is with procurement type 'E' then Planned orders will be created.

For the components check whether stock or open PO's are avaialble

csaba_szommer
Active Contributor
0 Kudos

Hi Natalie,

Are you sure the PldOrd for FER3 was generated by R/3 MRP run? PldOrds should have been generated by APO for it (because of MRP type X0).

Are you using 2 (Re-explode BOM and routing) for parameter "planning mode" in MD02? If yes, normally you should get PldOrd for the children parts.

Did you check the special procurement settings for the BOM items (in the BOM, since those settings override material master settings)?

Please also try to find answer on SCM-PP and SCM-APO forums.

Regards,

Csaba