cancel
Showing results for 
Search instead for 
Did you mean: 

Batch Management - Changing Material level to Plant level

Former Member
0 Kudos
142

Hi friends,

We are configuring batch management for ECC 6.0 with CRM 5 .

I can see the batch level in my system as Material level. But we would like to convert batch level in to Plant level. when i try to convert the batch level i am getting error "This type of conversion is not implemented".

There is no batch record exists in the stock.

Please clarify why can't able to change to plant level from material level.

Thanks

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

YOu need to use the OSS note 41715

This will explain what exactly you need to do.

Please go through the above OSS note.

Answers (0)