cancel
Showing results for 
Search instead for 
Did you mean: 

Batch Derivation at GR with 2 senders (same component but different batches)

marcose
Explorer
0 Kudos
488

Hi SAP experts,

There is a Finished Good with just one Semi Finished Good in its BOM. For this two materials I have set batch derivation in order to derivate manufacture date, expiry date and Producer batch (characteristic type: char) from SFG to FG.

I have two batches for the same SFG: A and B (with different classification values).

Batch A manufacture date: 10.10.2021 Expiration date: 10.10.2025 Producer batch: BP1

Batch B manufacture date: 10.10.2022 Expiration date: 10.10.2024 Producer batch: BP1_1

Then, I created a production Order for 200 FG, with 2 row components: 100 SFG (batch A) and 100 SFG (batch B).
Through CO11N I create a first FG batch (I name it C), by consuming 100 SFG of batch B, but the result is that C has the following classification values:

  • manufacture date: 10.10.2021
  • Expiration date: 10.10.2024
  • Expiration date: 10.10.2024

So, a mix of the two batches classification values. I think it chooses the minimum date (but for producer batch I cannot understand why it chooses batch A).
How can I solve this? I obviously want derivation totally from Batch B If I consume from batch B.

Thank for your time

Accepted Solutions (0)

Answers (0)