i'am trying to do a backflush with HU in repetitive Manufacturing with tcode MFHU
i would like to do a GI of components based on Components HU and post the GR on planned order
to resume i have product A_ finish good with component B; both of them managed with HU
i have a planned order on product A , i need to do a GI with HU of component B and a GR with HU of component A
as of today the MFHU is doing only a GR with HU on A. when i'am trying to do a GI with HU of compoennt B i have
"Invalid combination of material and planned order" error message.
can you please tell me what i'ma doing wrong: which should be the process end to end to be abmle to run such scenario
thanks regards
Lena
Dear,
During backflush, you need to check whether the receiving and issue storage location determined or entered is HU managed. Check the production version in material master the issue and receiving storage location HU.
Regards,
R.Brahmankar
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Dear,
During the confirmation of a handling unit with Transaction MFHU you can enter a planned order whose material number does not correspond to the material number of the material packed in the handling unit.
The error only occurs if the planned order entered for a handling unit does not match the material packed in the handling unit. That is, each of the material numbers are different. The error is caused by the fact that no check is carried out for the HU confirmation as to whether the material from the entered planned order corresponds with the material from the handling unit.
Please check and confirm the same.
Regards,
R.Brahmankar
User | Count |
---|---|
94 | |
9 | |
8 | |
8 | |
6 | |
5 | |
5 | |
5 | |
4 | |
4 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.