cancel
Showing results for 
Search instead for 
Did you mean: 

Back flush issue for process order

former_member351306
Participant
0 Kudos

Hi

A component (C1) is a back flushed item in the process order and is also set for 'net id' check with a component scrap of 10% in the BOM (no operation scrap is specified either in the BOM or recipe). The process order has an assembly scrap of 10%. I create a process order for 100 EA, the requirement qty for the component C1 in the order is 110 EA (1 EA finished product requires 1 EA C1), which is exactly what we want. However, when we do confirmation for the process order for 100 EA and a scrap of 10 EA, the back flushed qty for C1 is posted as 110 +10 = 120 EA. My scrap is for the finished product and physically I still consume only 110 EA of C1 for producing 100 EA of the finished product with10 EA scrap. My question is, why is SAP back flushing 120 EA of component C1 and not 110 EA? How do I correct this issue? I want the system to back flush only 110 EA of C1.

Any help or suggestions are much appreciated.

thanks

BE.

Accepted Solutions (1)

Accepted Solutions (1)

rupesh_brahmankar3
Active Contributor
0 Kudos

Hello,

This is as per the standard SAP system design, if you confirm the order with quantity 100 then component C1 will be backflush as 110 as per the component scrap.

Now it is something like that you can confirming 110 quantity (whereas 10 is scrap) then you consumption should be 120 as you have produced 110 out of that 10 is scrap.

You can use BAdi WORKORDER_GOODSMVT mthod like BACKFLUSH to change the quantity as per your own custom logic.

Best Regards,

R.Brahmankar

former_member351306
Participant
0 Kudos

Hi Brahmankar

Thank you for confirming that this SAP standard and not issue with our master data/config set up. We'll look into the BADi you proposed. Thanks a lot.

BE

Answers (0)