what checking rule does the PRs use upon PR creation ?
Request clarification before answering.
For PR creation sytem does not use any checking rule. Sytem uses availability checking rule in MRP before PR creation . After this availability check, if any shortage exists only then system creates PR if the material is externally procured. Therefore the availability checking rule comes to picture before the PR creation.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
Availability check & checking rule is not functioning to create PR.
To create PR, system do net requirement calculation.
Regards,
Dharma
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
Hope the checking rule you are asking is while creating PR through MRP run
Sys performs net requirement claculation
The system checks whether it is possible to cover requirements with the plant stock and fixed receipts(GR) already planned. In the case of a shortage the system creates a procurement proposal.
[Net requirement calculation|http://help.sap.com/saphelp_46c/helpdata/en/f4/7d3f9344af11d182b40000e829fbfe/frameset.htm]
Regards,
SVP
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
95 | |
39 | |
8 | |
6 | |
3 | |
3 | |
3 | |
2 | |
2 | |
2 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.