Hi Gurus,

We want the MRP to generate automatically a purchase requisition, instead of a planned order, for a semi-finished product. Of course, we still want to be able to convert it to a planned order.

thanks

Jean-Francois Millaire

Accepted Solutions (0)

Answers (3)

Answers (3)

Former Member
0 Kudos

Hi,

You have to select procurement type F in the material master (MRP2 view) and also you have to select Creation Indicator for Purchase Requisitions as 1 or 2 during MRP run.

Thanks,

Srinivas

Former Member
0 Kudos

it is conrrolled by procurement type field in MRP2 view of HALB material master, in which you maintain procurement type as E instead of X or F, then run MRP...it will work

0 Kudos

now our procurement type field in MRP2 view is set to 'X', since we want to able to do external procurement or in-house production.

Former Member
0 Kudos

if it is X, then while running MRP, make sure that the creation indicator is 3- planned order, so that system will create planned order first which you can convert to PR or production order.

Hope it will satisfy yr requirement

0 Kudos

No, unfortunatley I want the opposite.

default: Purch. req. with option of planned order.

Former Member
0 Kudos

Hi,

Please check MRP control parameters in MRP group (t. code OMD1)

0 Kudos

sorry, could'nt find anything wrong Srinivas. I checked 1 creation purch req.

thanks

JF

Edited by: Jean-Francois Millaire on May 21, 2008 10:05 PM

Former Member
0 Kudos

Dear,

IF that is the case, what system is doing is correct, system will create PR...then what is your question?

you wanted system to create planned order which can be converted to PR or production order for which we all gave the solution.

Can you please tell me exactly what are you looking for?

0 Kudos

Hi,

My MRP is creating a planned order that I can convert to a purchasing req for a semi-finished product in MD04. But I want the MRP to generate a purch. req. first and then, if I want, still be able to do an in-house production in MD04.

hope its more clear,

thanks

JF

Former Member
0 Kudos

No, if you have X, then system will create PL order which can be converted to PRor prod order, reverse case is not possible.

0 Kudos

thanks to all

Former Member
0 Kudos

Hi Jean,

"Default: Purch. req. with option of planned order".

I dun think it is possible. Could you please elaborate the reason for this requirement, so that the alternative solution can be thought.

Regards,

Satyajit

Former Member
0 Kudos

Hi Jean-Francois Millaire,

You want a purchase requisition after MRP run & you should also able to convert that purchase requisition to planned order,If i understood correctly, hope this is your requirement

First one is possible -in MD01/MD02 maintain create purchase requisition as "1"

Second is not possible,its not possibel to conver a PR(purchase requisition to Planned order where as vice versa is possible

confirm my understanding,pls revert if you differ

Regards,

SVP

0 Kudos

in MD01, I already selected 1 Create Pur. Req. You understand correctly. I want the MRP to generate a purch. req. as default, but still want the option to send it to in-house production.

Former Member
0 Kudos

When you select procurement type X in material master and Creation Indicator for Purchase Requisitions as 1 in MD01(MRP run), then it will create purchase requisiton as default.

Thanks,

Srinivas

0 Kudos

I'm afraid there is another setting somewhere, because I just tested with '1' in MD01 and X in mat. master HALB and still do a planned order.

thanks

JF