396

Hi Gurus,

Want to auto settle maintenance (material + labour) cost to multiple or groups of cost centres in PM work order.

In a normal scenario, we settle all costs to an equipment cost centre but I want to settle to multiple cost centers (3 CC). How that can be configured. Manually it is possible but how it can be automated.

Regards,

Nick

View Entire Topic
peter_atkin
Active Contributor
0 Kudos

Nick,

How would you decide the cost centres to be used in settlement, and what proportion of the costs would be attributed to each cost centre?

As Vijay points out, you will probably need to to develop a solutoin via user-exit IWO10027 (SMOD).

PeteA

nakul_ahirrao
Participant
0 Kudos

Hi Pete,

I have already defined equipment, respective CC and proportion. The list will be like below.

In this case, what would your suggestion.

Machine 1 CC1 50 CC2 50 Machine 2 CC5 10 CC7 80 CC9 10
former_member367064
Participant
0 Kudos

We created an enhancement which applies settlement rules based on the Maintenance Activity Type on the order. Essentially what happens is the program runs, and finds the appropriate settlement rule in a table using the specified MAT and applies it to the order. You could probably do something similar but make the lookup based on FLOC or equipment.