hello,

i want solution for alternative bom selection.

for eg.

i have material say X00100 which has two alternative components

A00100

B00100

now, i have to mapped the scinario that .the product pick the material A00100

first & if there is no stock then it will pick the material B00100

please give the solution

marks are sure

regards,

mangesh

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Hi

you try with Alt item group functionality in BOm maintainence.

Regards

YMREDDY

Former Member
0 Kudos

tell me more about (to create)Alt item group functionality in BOm maintainence

thanks

Answers (4)

Answers (4)

Former Member
0 Kudos

Hi,

Try using this concept.

In BOM alternative items are assigned to alternative item group on the general

data.

In the production order in the general data tab page.

We can define the alternative items based on priority , strategy and usage probability.

Priority:

This defines the priority of the item within the alternative item group.

This determines the priority of planned withdrawls of items.

EX Two items are assigned to alternative item group

item A Priority 1

item B Priority 2

The system reads the item A first.

Strategy:

use the strategy to determine how the planned withdrawl is controlled

within the alternative item group.

The strategy should be same for all alternative items within a alternative

item group.

If the value 2( 100% check) is defined for the strategy the first material in

the defined priority sequence for which sufficient quantities are available

are reserved.

If value 1 is used( manual maintainence/ usage probability) depending upon the

availability you can manually with draw components.

Usage Probability:

MRP Plans these alternative material components according to probability

of use.Material requirements for BOM Components are planned according

to usage probability.

The planned withdrawls for the production order are based on the

reservation lists.These lists are based on the priority and strategy.

Regards,

nandha

former_member196398
Active Contributor
0 Kudos

Mangesh,

Please go through this thread <b></b> this should help in your decision making.

Add both the components to the BOM and define with alternate groups, with strategy 2

Regards,

Prasobh

Message was edited by:

Prasobh Karunakaran

added comments

Former Member
0 Kudos

Automatic selection is not possible...you can work with priority indicator in alternate group indicator in BOM item data...when you create production order then per priority reservations will be created for this item and withdrawel will take place if stock is found.

Otherwise work with stock determination group.

Regards

TAJUDDIN

Former Member
0 Kudos

THE FLOW FOR THE ALTERNATIVE BOM

I. CREATE A SINGLE BOM(X00100) BY CS01 WITH THE COMPONENT A00100

2.GO TO CS01

3.ENTER THE MTERIAL THAT ALREADLY IN STEP 1

4.ENTER IN ALT BOM AS 1

SELECT ALL THE COMPONENTS---COPY---ENTER

5. CHANGE THE COMPONENTS B00100

SAVE- COPY -ENTER.

6.CLICK HEADER FOR DEFINE BOM GROUP

AND THE BOM TEXT -


SAVE

7. CHECK WITH THE CS05