ALTERNATE NO CHANGE FOR BOM

Former Member
0 Kudos

Hi,

we are having alternate bom concept. We had created two bom for one material M1. alternate no for first bom is 1 and for second bom is 2.

But now we want to use alternate no 2 for inhouse prod. so we want to make 2nd bom as first and first as second for material M1.

please help

Accepted Solutions (1)

Accepted Solutions (1)

Ritz
Active Contributor
0 Kudos

Awnindra,

Once BOm is created its not possible to change the alternatives , it will be better you make changes in Alternative one and make it same as alternative 2.

or delet and archive both 1 and 2 and create them again.

Check and revert back.

regards

Ritesh

Answers (1)

Answers (1)

former_member184655
Active Contributor
0 Kudos

Dear Dutt,

This is not possible in SAP.But you can set the status as 02 inactive for the first alternative and 01 active for the second one.

This will give the correct results while taking MRP run or else use production version ,assign the second alternative BOM in the

production version,keep the BOM selection method as - 2 or else 3.

This will help you.

Check and revert back.

Regards

Mangalraj.S