Alternate determination of muliple BOM's

Former Member
0 Kudos
107

Hi,

We are maintaining multiple BOM's. We have also maintained muliple production versions. Selection setting in material master is kept as 2(by production version). No when we run MRP what is the criteria of selecting a specific production version considering all production versions meets requirements of lot size & validity.

Secondly is it a manual process or automatic process.

We are using REM.

regards,

Mohit

Accepted Solutions (0)

Answers (5)

Answers (5)

Former Member
0 Kudos

Mohit,

If you have more than one prod versions and all are meetings the required settings then the first version will be selected by defualt in the planning run in version. Version is mandatory in planning run so there will be no question of manual selection of prod verison in planning run. either you have to assign the prod versions manually from MF50 or MD12 transactions after MRP run or directly you can assign to the PIRs from MD62 transaction in schedule line tab.

Otherwise for autmatic selection you have to set "validity set".."version relevent for REM indicator"...lot sizing criteria in version...or quota arrangement from MEQ1 with 4 indicator in MRP2 view.

Hope the above clarification will help.

Regards

TAJUDDIN

former_member184655
Active Contributor
0 Kudos

Dear Mr.Mohit,

<b>I hope now you must be clear in production version concept,and how its getting picked during MRP.

If satisfied,reward points and close the thread.

If not revert to forum.</b>

Thanks & Regards

Mangal

Former Member
0 Kudos

THERE ARE TOO MANY OPTION IS THERE TO GIVE THE SPECFIC PROD/VERSION TO RUN AT PERTICULAR TIME

SELECT THE PROD/VERSION AND DELETE ALL OTHER PRO/VER

FOR THE MATERIAL

(ii) THE RUN TIME AND THE VALID DATES SPECIFY THE WHICH PROD/VER

HAS TO RUN IN MRP

(iii) THE LOT SIZE FROM WHICH TO WHICH LOT SPECIFY THE WHICH PROD/VER HAS TO RUN IN MRP

former_member184655
Active Contributor
0 Kudos

Dear Mr.Mohit,

In REM - If you have more than 1 production version for your FERT with the fllowing conditions

(With same valid From & To Date)

(Same Lot Size,with different BOM & different routing)

then defaultly,the system considers the first production version and proposes the requirements as per the BOM which is attached in first production version.

<b>If you want to choose a particular production version ,assuming that u r not willing to change the lot size or valid from & to date,then u lock the production versions which you dont want to show to the system before running MRP except the one which u r willing to choose.</b>

We cant choose manually the prod.version during MRP.

<u>Assuming that in MRP4 view of FERT material u have given option 2 in BOM slection method.</u>

The other way is u manitain different lot size and acccordingly the production version will be selected by the system.

I hope now u must be clear regarding Production versions concept.

If useful reward points

Thanks & Regards

Mangal

Former Member
0 Kudos

Hi,

In this case system will select first production version only.If u want to selct it manually as per requirement. If there is changes in components or operation in alternative vesions, then assign production version during PIR, or create BOM number by T code MDSP & enter during PIR or in sales order.

So that system will schedule or read BOM according.

Regards,

Suhas