on 2012 Jan 06 11:34 AM
Hi,
I attached one material to the WBS-activity and created scenario PR -> PO -> GR -> GI / delivery.
The value is showing in actual cost.
Please anyone can suggest me the name of table, so that i can track the actual cost using GI / delivery.
Regards,
Vikas
Hello ,
Use COSP or RPSCO table.
Regards
Keshav
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi, Vikas!
Have you tried to take a look at COEP table? If you cannot get the information you want directly in COEP, I'm afraid you'll have to go to BSEG table, which is not a good idea... If you have no other option and you'll use BSEG for that anyway, you should consider using an Index for better performance.
Regards,
Ivanna
Hi,
Pass the OBJNR in the RPSCO table selecting value type 4 to get the actual cost. Double click on the line item that shows the required value. Check if there is something as a reference document number. Try passing this in COSP and check. Else you can check out the BSEG table, which even i feel is not a better option.
Regards,
Gokul