Activity price and unit picked up wrongly while costing run

Former Member
0 Kudos

Hi all,

I have a activity called (RAWWATR) in my resouse.The activity type assigned is also named RAWWTR.The activity assigned to my Master Recipe is with sp cons 1.026 MT and the Price in KP26 is Rs 11.00/MT.

When i am doing a cost run the Qty picked up in CK11N is 1.026 TO

and total price picked is 11.00 Rs only,Which is of 1 Mt only.

Why is the wrong unit being picked up and costing for 1 MT only.

Please give me a solution for this.

Regards

Chitradeep Dutta

Accepted Solutions (0)

Answers (1)

Answers (1)

Former Member
0 Kudos

Hi frnd,

Please check ur material UOM and also check the costing lot size.

Also check the BOm for that material.

Hope u will find some way to this problem

Assign points if useful

Regards,

Jigar